Friday, October 29, 2010

Thursday, May 27, 2010

Moved in but not quite Moved around


The beams turned out very very well. As did the concrete floors. The interior painter was great, JK refurb'd a frig wood covered wooden doors and all in all? We're unpacked! The foam insulation so far is making a huge difference in both cold and heat. All fluorescent lights takes a bit of getting used to (slower to light up) but energy efficient!

Finally! I have remembered the log on!


I have 1000 at least passwords, logons and numbers rolling around. and numbers and I aren't that close of friends! the move is over! the barn is well lived in - we're 1/2 way down a page of at least 25 pages of things that remain to be done but at least we're there!


It's green, summer feels like it's here to stay, the bees are busy, honey is almost ready and of course its way beyond time to brush hog the pasture!
We're also the proud parents of a pole barn:)




Wednesday, March 3, 2010

More photos to follow



But - 1/2 in moving. 1/2 out moving. And Discovering that we really do not need all this STUFFFFFFF!!!


Friday, January 22, 2010

Have not forgotten the bees


The bees are wintering but not forgotten, Joel will be moving one more hive to the barnouse this winter before spring hits, he is probably going to put some sugarfood out for them soon and check to make sure other critters aren't raiding their stored honey supply!

Sunday, January 17, 2010

The last of the big messes (hopefully)

Kitchen area is rather last to have things set in place. kinda a mess now.


Lights near ceiling




Since windows are at a minimum lights go along the wall with canned lights (fluorescent eco friendly bulbs) around kitchen area.



To the left pocket doors that were damaged - refurb'd and look fantstic now. (recycle, reuse)